Written from the drawing.
Instrument indexes, I/O lists, loop checks, revision control and the standards behind them, written for the engineer holding the P&ID.
Older articles.
Page 10 of 10
- DCS migration. Reconstructing current scope from P&IDsWhy DCS migration discovery work overruns, what the as-built scope actually means, and how to keep the discovery phase from blowing the schedule.
- Counting instruments on a P&ID without missing scopeCounting instruments on a P&ID: what counts on a bid I/O count, how to handle redundant pairs, what to ignore, and tag-suffix patterns that flag missed scope.
- What Changed in ISA 5.1. The 2022 and 2024 Revisions, Read for the I/O ListISA's own account of the 2022 revision (clarifications and corrections) and the 2024 edition (new title, new symbols, annexes moved out), for the tag list.
- Reading Legacy 1980s P&IDs. A Digitizing GuideLegacy 1980s P&IDs use conventions not always compatible with modern ISA 5.1: what the older drawings get right and where they confuse modern engineers.
We run it on your drawings.
Your P&ID set comes back as the instrument index, the I/O list and the equipment, line and valve registers.