Written from the drawing.
Instrument indexes, I/O lists, loop checks, revision control and the standards behind them, written for the engineer holding the P&ID.
Older articles.
Page 4 of 10
- TEMA vs API 660, How the Two Standards Fit TogetherWhat is the difference between TEMA and API 660? TEMA governs exchanger mechanical design, and API 660 is the refinery purchase spec built on it.
- Equipment Datasheet vs Instrument Datasheet. What Each One SpecifiesAn equipment data sheet specifies a major asset. An instrument datasheet specifies a device. Where the line falls and why procurement conflates them.
- RTU vs PLC. What Changes on the I/O List and the RegisterRTU vs PLC compared by application and distance rather than a spec sheet, plus what the choice changes on the I/O list and the site register.
- Tie-In Points and Where New Work Meets the Existing PlantA tie-in point is where new work connects to the existing plant on a brownfield project, and it drives the shutdown schedule and the tie-in register.
- Marshalling Cabinet vs Junction Box, and the Wiring Path Between ThemMarshalling cabinet vs junction box, the path field wiring takes from device to I/O card, and what each document records.
- When a LOPA Needs RevalidatingLOPA revalidation is triggered by an MOC, a new SIF, an incident, or a changed IPL. What it demands of the P&ID, the SIF register, and the I/O list.
- FAT vs SAT, and What Each One Is Checked AgainstFAT vs SAT compared side by side, what each test proves, what it runs against, and how an I/O list change after FAT becomes a SAT problem.
- Mechanical Completion, the Gate Before CommissioningThe punch list and its A/B split, what construction must prove at the mechanical completion gate, and why a stale P&ID stalls the handover to commissioning.
- ISA 84 vs IEC 61511, Are They the Same Standard?ISA 84 and IEC 61511 compliance in one answer. What the US national standard shares with the international one, and what a project spec asks for.
- The HVAC Equipment Schedule: The Columns That MatterThe columns that belong on an HVAC equipment schedule, a worked example by equipment type, and where the schedule comes off the mechanical drawing set.
- PROFINET and PROFIBUS on the I/O ListPROFIBUS and PROFINET put many devices on one segment. How a networked device differs from a hardwired point, and how to list it without double-counting.
- Alarm Rationalization: From P&ID Alarms to an ISA 18.2 Alarm ListWhat alarm rationalization is, the ISA 18.2 lifecycle in plain words, and how P&ID alarms become a master alarm database of justified, prioritized rows.
We run it on your drawings.
Your P&ID set comes back as the instrument index, the I/O list and the equipment, line and valve registers.