OSHA Process Safety Management, 29 CFR 1910.119.
Under 1910.119, d, the Process Safety Information has to reflect the plant as it stands today. A PSI package stamped against a drawing revision three years behind the as-built is a finding before the PHA team sits down. PSM-covered facilities typically carry a significant SIS scope alongside the BPCS. For guidance on producing the safety instrumented system documentation that the PHA and MOC records depend on, see the SIS documents reference.
Related.
Common questions
Does Tagsight make our facility OSHA PSM compliant.
No. Compliance with 1910.119 remains the operator's responsibility and depends on the full PSM programme. PSI, PHA, MOC, training, mechanical integrity, and so on. Tagsight produces the structured controls documents that several of those PSM elements depend on. It does not certify compliance and does not replace the engineering judgment that the standard requires.
Can Tagsight feed our existing MOC software.
The export formats include Excel, CSV, and structured JSON. Most MOC platforms accept one of those formats either natively or through a customer_built import. The revision comparison report is shaped to be attached directly to an MOC change record.
How does the drawing traceability help during a PSM audit.
An auditor often asks the question, where does this tag come from on the drawing. Every row in the I/O list resolves to a specific page and region on the controlled drawing, so the answer is always at hand.
OSHA PSM audit trail.
Upload the relevant P&IDs, extract the instrument and equipment inventory, and export the structured records that a OSHA PSM audit trail expects.