Written from the drawing.
Instrument indexes, I/O lists, loop checks, revision control and the standards behind them, written for the engineer holding the P&ID.
Older articles.
Page 8 of 10
- ANSI/IEEE C37.2 Device Function Numbers. A Working ReferenceANSI/IEEE C37.2 device function numbers: the codes on protection relays and switchgear diagrams, and how they fit alongside ISA 5.1 letters on a P&ID.
- How to Read a Cable ScheduleWhat each cable schedule column means to procurement, construction, and commissioning, and the errors that reach site when the schedule is issued wrong.
- DEXPI 1.3 Schema Explained. Process Industry Data Exchange in PracticeDEXPI 1.3 P&ID exchange format: schema structure, what fields it carries, ISO 15926 alignment, and when teams pick it over native CAD formats.
- API RP 552 Instrumentation RequirementsAPI RP 552 instrumentation requirements for transmission systems: what it covers and how requirements cascade into instrument selection and P&ID markup.
- SIL-Rated I/O and BPCS Separation ExplainedSIL-rated I/O: how SIL ratings change instrument selection, I/O list structure, and the line between safety systems and basic process control.
- Commissioning Loop Check Plan. What to Prepare Before the First CheckCommissioning loop check plan: pre-check setup, loop-check sequence, documentation templates, and what causes the most delays once the PLC is energized.
- NORSOK Z-DP-002 Coding ExplainedNORSOK Z-DP-002 tagging on offshore oil and gas projects: tag-number structure, example tags, and how it interacts with IEC 81346 and ISA 5.1.
- KKS Coding Explained. How to Read KKS TagsKKS, the Kraftwerk Kennzeichensystem, tags power plant equipment worldwide. How the function key, unit, and component levels build a KKS number.
- MOC and P&ID Documentation. Why I/O Lists DriftHow Management of Change breaks down when instrument documentation drifts from as-built. Why I/O lists go stale and how to catch it before commissioning.
- Loop Diagrams vs P&IDs. When to Use WhichP&ID vs loop diagram: what each drawing shows, which is authoritative for tags, wiring, and rack-slot-channel assignments, and when each is issued.
- Inside a TIA Portal Export. Siemens I/O TagsThe Siemens TIA Portal XML export structure for I/O tags. GlobalDB blocks, tag tables, and the S7-1500 versus S7-1200 differences.
- How to Read P&ID Instrument Symbols. Bubbles, Tags, LinesWhat the circles, lines, and letter codes on P&ID drawings mean. Covers ISA bubble types, tag number formats, signal line connections, and how to read them.
We run it on your drawings.
Your P&ID set comes back as the instrument index, the I/O list and the equipment, line and valve registers.