Wood.
On a brownfield revamp, a tag that appears on the as-built but not on the IFC is either a removal or a drawing error. The Wood reconciliation work is judging which, hundreds of times, under document-control deadline pressure.
Primary standard: Client-driven plus Wood internal practice
- Project I/O list against the client-specified tagging convention
- Master instrument index across the full project drawing set with tag uniqueness
- Equipment list keyed to vessels, pumps, compressors, packaged skids
- Line list with pipe class, service, metallurgy
- SIS register per IEC 61511
- Revision comparison between legacy as-built and current IFC for brownfield revamp
- MOC change records suitable for the operator's MOC procedure
- Operator-specific tagging conventions across hydrocarbons, chemicals, and renewables come through as drawn
- Image-based ingestion covers scanned legacy as-builts on brownfield revamp scope
- Revision comparison produces the change records brownfield MOC discipline needs
- BPCS, SIS scope segmentation onto distinct sheets
- Multi-page drawing sets process page-by-page
- Direct exports to TIA Portal, Studio 5000, PLCCreator, DEXPI
Wood is referenced descriptively. Tagsight has no affiliation with John Wood Group plc.