P&ID digitization for oil & gas.
Oil and gas P&IDs accumulate. A turnaround pack rarely matches the as-built it replaced, the operator overlay on top of ISA 5.1 changes with the asset, and the same set can carry three CAD vintages before the next revision freeze.
What oil & gas drawings carry.
- Operator tag conventions read as drawn. NORSOK, Shell DEP, Aramco SAES, ADNOC AGES, Equinor TR, BP RP, Petrobras N, and in-house dialects alongside ISA 5.1
- SIS scope kept distinguishable from BPCS for the IEC 61511 audit, ready to check against the safety documents
- Wellhead panels and skid drawings often arrive as scanned PDFs or field photographs. PNG, JPG, TIFF supported, each row keeps its place on the drawing
- Large sets, refinery revamps, LNG commissioning, 100 plus pages process as a single workspace, with signals that continue across sheets kept connected
- FPSO topsides and subsea umbilical drawings carry NORSOK I-005 system numbering and asset-specific prefixes. Read as drawn, not retranslated
- Sour service lines. NACE MR0175, ISO 15156 callouts captured in the line list spec column where the drawing prints them
What the extraction delivers.
- I/O list with signal classes (AI, AO, DI, DO or Review) and SIS, BPCS separation
- Equipment list. Pumps, vessels, tanks, exchangers, compressors with tag, type, description
- Line list with size, pipe spec, service, joinable back to instruments
- Valve list with fail position, actuator type, connected equipment
- Process variable, range, and protocol where captured on the drawing
- Revision comparison feeding MOC documentation packages
- Exports to TIA Portal, Studio 5000, PLCCreator, DEXPI, Excel
Instrument tags on a oil & gas drawing.
- FT-2103-AFlow transmitter, train 21, loop 03, redundant A
- PSV-4101Pressure safety valve, unit 41, line 01
- ESDV-PS03-205Emergency shutdown valve at pump station 03
- AT-7308Analyzer transmitter on amine sweetening, online H2S monitor
- PSH-7250-1oo2Pressure switch high, voted 1-out-of-2, SIS service
- 20-PT-1015NORSOK-style pressure transmitter on system 20, loop 1015
Regulatory context.
- OSHA PSM 1910.119, US drives MOC discipline for covered processes
- EPA RMP overlaps PSM with environmental documentation
- IEC 61511, ISA 84 enforces SIS lifecycle including proof-test cadence
- API RP 752, 753 facility siting references P&ID-derived equipment locations
- PHMSA Part 192, gas and Part 195, liquids cover pipeline integrity documentation
Which discipline reads it.
Where the handover record comes from.
“What a P&ID can Establish about an Equipment Record”, by our founder Muaawia Jannat, published in IEM Jurutera on November 3, 2026, sets out what a P&ID can and cannot establish about each pump and transmitter in an equipment record, why the evidence belongs on the field rather than on the whole record, and what a reviewer does when a note is illegible or two documents disagree before handover.
Common questions
Does this work on scanned legacy oil & gas P&IDs.
How does SIS, BPCS separation work.
Can I handle a 200-page drawing set for a refinery unit revamp.
Does this help with MOC documentation.
What comes back from offshore and FPSO drawings.
Can it extract from wellhead panel photographs taken in the field.
We run it on your oil & gas drawings.
A pilot reads your own drawings end to end, so your engineer reviews the instruments, equipment, and lines before the rest of the project goes in.