Moving off AutoCAD Plant 3D into structured tag data.
The I/O list, equipment list, and line list come from the drawings you already have, without spec-sheet or project-file setup.
Plant 3D keeps the model, the P&ID data moves.
Teams transitioning off Plant 3D for the P&ID data side usually keep Plant 3D for what it does well: the 3D piping model, isometric drawing generation, clash detection. The P&ID data extraction routes through Tagsight in parallel.
How the transition runs.
- 01Parallel passThe pilot takes an active project. Its I/O list, equipment list, and line list come back from the drawings, and the team compares them with what the Plant 3D Data Manager gives for the same project.
- 02CutoverOnce the parallel runs agree, new projects skip the spec-sheet setup. Drawings go in and the registers come back.
- 03Legacy backfillSheets that predate Plant 3D, scanned or photographed, are accepted and get their registers too.
No project files to migrate.
The P&ID itself is enough, whether a Plant 3D export, a scanned legacy sheet or an image of one.
Tags come back in the convention the sheet prints, ISA 5.1, KKS, IEC 81346, NORSOK, JIS, GOST or an in-house code, with no configuration step.
Your drawings, with no spec setup and no catalog configuration.
Two revisions are compared in Revision Comparison, and the Excel Change Report lists the added, removed and modified instruments.
- TIA Portal XML, Studio 5000 L5X, PLCCreator CSV, DEXPI XML, Excel, CSV, JSON. All from any P&ID project.
- Scanned, photographed, or vector PDF, all supported.
Two workflows, six decisions.
Where the Plant 3D workflow concentrates engineering effort, and where the Tagsight workflow concentrates it instead.
| Topic | AutoCAD Plant 3D | Tagsight |
|---|---|---|
| Source format | Plant 3D project files, spec sheets, and data-linked drawing attributes maintained inside the AutoCAD project. | The drawing itself, as vector PDF from Plant 3D, scan of a legacy sheet, or image. No project files to migrate. |
| Tag convention | Defined by spec sheets and project setup; new conventions require new spec entries and re-validation. | As the drawing prints it. ISA 5.1, KKS, IEC 81346, NORSOK, JIS, GOST, or any in-house code, no configuration step. |
| Revisions | Tracked through the AutoCAD project structure and external version-control practices. | An Excel Change Report of the added / removed / modified instruments between two PDFs. |
| Project setup | Each project gets a Plant 3D project folder with spec sheets, catalog files, and template configuration before drawing starts. | Drag the drawings into a workspace. No spec setup. No catalog configuration. |
| Export formats | Plant 3D Data Manager export to Excel; downstream PLC vendor formats require additional tooling or manual transformation. | TIA Portal XML, Studio 5000 L5X, PLCCreator CSV, DEXPI XML, Excel, CSV, JSON. All from any P&ID project. |
| Legacy drawings | Pre-Plant 3D scans require re-drawing in the project before they can carry structured data. | Scanned, photographed, or vector PDF, all supported. |
Common questions
Does Tagsight need the Plant 3D project files or spec sheets?
Can Tagsight read drawings exported from Plant 3D?
What about scanned legacy P&IDs that predate Plant 3D?
How are revisions compared without the Plant 3D model?
Do we still need Plant 3D licenses for 3D modeling?
What tag conventions are supported?
Move off AutoCAD Plant 3D.
A pilot runs on your Plant 3D drawings and returns the I/O list, equipment list, and line list your team reviews.