Moving off a SmartPlant workflow into structured tag data.
The I/O list, equipment list, and line list come from the drawings you already have, without a project database to maintain.
No migration cliff.
The typical transition runs in three phases. During the parallel pass, the I/O list, equipment list, and line list from Tagsight are checked against the SmartPlant output for the same project.
The SmartPlant workflow continues for in-flight projects until they close out. There is no migration cliff; no project database to export, no schema to convert.
The scanned drawings sitting in the EDMS get their registers too.
How the transition runs.
- 01Parallel passFirst, the team picks one or two active projects and processes them through Tagsight in parallel with the existing SmartPlant workflow.
- 02CutoverSecond, once the parallel pass meets the engineering team’s expectations, new projects start in Tagsight directly.
- 03Legacy backfillThird, legacy drawings that were never modeled get their registers too.
The drawing is enough.
The registers come back from the sheets, with no project database and no schema to maintain.
Tags come back in the convention the sheet prints, ISA 5.1, KKS, IEC 81346, NORSOK, JIS, GOST or an in-house code, with no configuration step.
Run both workflows in parallel as long as you need.
The old and new PDFs are compared in Revision Comparison, and the Excel Change Report goes to MOC.
Extracts export to Excel and standard PLC formats from day one.
- TIA Portal XML, Studio 5000 L5X, PLCCreator CSV, DEXPI XML, Excel, CSV, JSON. All available from any P&ID project.
- Scanned, photographed, or vector PDF, all supported.
Two workflows, six decisions.
Where the SmartPlant workflow concentrates engineering effort, and where the Tagsight workflow concentrates it instead.
| Topic | SmartPlant P&ID | Tagsight |
|---|---|---|
| Source format | Intelligent P&ID model with a project database (.spd files, tagdb.cfg) maintained alongside the drawings. | The drawing itself, as PDF, scan, or image. No project database required, no schema to maintain. |
| Tag convention | Configured up-front in the project database. New conventions require a schema edit and re-validation. | As the drawing prints it. ISA 5.1, KKS, IEC 81346, NORSOK, JIS, GOST, or an in-house code, no configuration step. |
| Revisions | Managed through concurrent project versions and a central model; change reports generated from the model. | An Excel Change Report for MOC from the old and new PDFs. |
| Cutover | Schema migration plus a coordinated team move. Hard to run in parallel for long. | Run both workflows in parallel as long as you need. Extracts export to Excel and standard PLC formats from day one. |
| Export formats | Vendor-native schemas plus selected interchange formats; export configurations maintained per project. | TIA Portal XML, Studio 5000 L5X, PLCCreator CSV, DEXPI XML, Excel, CSV, JSON. All available from any P&ID project. |
| Legacy drawings | Often live outside the model entirely; re-modeling each one consumes engineering time. | Scanned, photographed, or vector PDF, all supported. |
Common questions
Do I need to keep the intelligent P&ID model running to use Tagsight?
What about the tag convention defined in the source project?
Can we run a parallel pass during cutover?
How do revisions work without a centralized project model?
Does Tagsight produce DEXPI?
What happens to legacy drawings that never made it into the intelligent model?
Move off SmartPlant P&ID.
A pilot runs on your SmartPlant drawings and returns the I/O list, equipment list, and line list your team reviews.