JB schedule to Excel.
Tagsight reads the junction box schedule into a structured workbook, with every JB tag, location, IP rating, terminal block, terminal range, cable reference and spare count.
What the JB schedule carries.
Each row in the output corresponds to one junction box. Every column maps directly to a field in the source schedule.
Each junction box links to the page it came from, where your engineers can check it before the workbook is exported.
From schedule to structured register.
- 01RequestThe register from your JB schedules
- 02ReviewAny junction box, confirmed or corrected
- 03ExportExcel or CSV
Common questions
Does it handle scanned JB schedules?
Yes. Scanned PDF schedules and digital formats are both supported. You can check any row against the page it came from and edit it inline.
How do terminal ranges come back?
As a start and an end terminal number in one range field, and as separate rows where the schedule lists the terminals one by one.
Can it match cable tags from a cable schedule?
Yes, when the cable schedule comes with the JB schedule. A cable tag that appears in both documents comes back paired, and you can check any pair against both pages.
What does the reserved spares column contain?
The count of spare terminals annotated on the JB schedule, per junction box. Blank when not annotated.
Does the tray or conduit reference come back?
Yes, when the schedule includes a tray or conduit column. The reference appears as-drawn in a dedicated field.
How do I start?
With a paid pilot on your own drawings. Request one and we scope it with you; pricing is quoted per project.
We convert the schedule.
A JB schedule comes back as a structured workbook, with every junction box, terminal range and cable reference already filled in.