MCC schedule to Excel.
Upload an MCC schedule, an SLD, or an MCC builder's submittal package and extract every bucket position into a structured register. Bucket position, motor tag, HP, voltage, starter class, FLA, breaker rating, overload setting, control method, and lockout reference all read into the columns commissioning and maintenance use.
What a motor control center schedule carries.
A motor control center, MCC schedule is the bucket-by-bucket register of every motor controlled from a given MCC section. One row per bucket carries the motor tag, driven equipment, rated horsepower, voltage, full load amps, FLA, starter type, FVNR, FVR, RVAT, VFD, soft-start, MV starter, starter class, breaker rating, overload setting, control method, local, remote, DCS, PLC, HOA, and the lockout point reference. The MCC schedule is what the MCC builder reads to fabricate the cabinet and what the commissioning electrician reads to verify each bucket on site.
Upload an MCC schedule, an SLD, or an MCC builder's submittal package and extract every bucket position into a structured register. Bucket position, motor tag, HP, voltage, starter class, FLA, breaker rating, overload setting, control method, and lockout reference all read into the columns commissioning and maintenance use.
From legacy file to clean register.
- 01UploadMCC schedule PDF
- 02ReadBucket detection
- 03ExtractStarter, breaker, overload
- 04ExportMCC register
MCC submittal vs. Extracted schedule
| Aspect | Builder submittal PDF | Extracted schedule workbook |
|---|---|---|
| Bucket numbering | Builder-specific section, row | Bucket position kept per row |
| Starter type | Mixed FVNR, VFD, soft-start | Per-row column, builder code preserved |
| FLA plus breaker | Tabular block per section | One column each, filterable |
| Overload setting | Margin on starter sheet | Per-row column for commissioning audit |
| Control method | Mixed DCS, PLC, local | Filterable column for hand-off scope |
| Lockout reference | Tag on MCC elevation drawing | Per-row cross-reference |
Common questions
Does this work with the submittal package an MCC builder returns.
Are VFD buckets handled differently from full-voltage starters.
Can the schedule feed a commissioning checklist.
Convert your MCC schedule.
Upload the motor control center schedule, read every row, review, and export the structured workbook your team uses.